New-Construction Radon Systems in Cedar Rapids
New-construction radon systems in Cedar Rapids, IA for buyers and builders — Iowa's passive-system requirement, rough-in verification, and fan activation.
Independent service-request website. Calls and forms may be shared with a third-party provider. The provider confirms availability, pricing, and service terms.
Iowa's July 2026 requirement, in plain terms
Beginning July 1, 2026, Iowa's state building code requires covered new single- or two-family residential construction to include a passive radon-mitigation method from Appendix AF of the 2021 International Residential Code. The requirement applies to covered construction commenced after adoption. A passive system has no fan; it provides the pipe and sub-slab pathway needed for later fan activation if testing shows activation is necessary.
CHECKED · JUL 24 2026 Source: Iowa HHS — Radon Resources, Radon-Resistant New Construction section; checked July 24, 2026.
What a proper rough-in includes
Under the slab: a gas-permeable layer (typically clean aggregate) or a suction pit, with sub-slab penetrations sealed. Through the house: a continuous labeled vent pipe from the slab to a discharge above the roof, routed so a fan can be installed in the attic or outside the living space — never in or below it. Plus an electrical junction near the future fan location. When any of these pieces is missing or the pipe dead-ends, the "rough-in" is a label, not a system, and verifying that is part of the request.
Buyers: test first, then decide
A new home with a passive system still gets tested after occupancy, with the house operating normally. If the result is below EPA's action guidance, keep the result as a baseline record. If it is elevated, follow the applicable confirmation guidance and have the passive system evaluated for fan activation; radon testing in Cedar Rapids is where that decision starts.
Builders and contractors
Requests from builders — rough-in installation on upcoming builds, verification of subcontracted rough-ins, or activation packages for buyers — go through the same intake. Describe the number of units, the construction stage, and the timeline, and the provider confirms scope and terms.